Under the River and Through the Woods

Project Name: Love Creek Crossing

Client:

Total Length:

Product Diameter:

Drill: DD100x140II Reclaimer: Vermeer R9x12

Ground: Running sand, dense silt.

Challenges: With ground conditions of running sand for the last 40 feet on the receiving side, Melcar had to install a steel washer casing to ensure a smooth pullback or the PVC. Preventing hole collapse and inadvertent returns under the river was top priority.

Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

Certified SBE Infrastructure Construction Contractor

Follow

  • Instagram
  • Melcar LinkedIn
  • YouTube

Contact

+1 (484) 653 8259

Locations

Washington, NJ

Elverson, PA

Houston, TX

Copyright © 2019 Melcar Underground. All rights reserved.