Follow

  • Melcar LinkedIn

Contact

+1 (484) 653 8259

Locations

Hackettstown, NJ

Elverson, PA

Houston, TX

Copyright © 2019 Melcar Underground. All rights reserved.

July 19, 2018

March 6, 2018

November 20, 2017

November 9, 2017

September 29, 2017

June 4, 2017

Please reload

Recent Posts

Hands-On Executives

March 6, 2018

1/6
Please reload

Featured Posts

Under the River and Through the Woods

July 19, 2018

Project Name: Love Creek Crossing

Client: 

Total Length:

Product Diameter:

Drill: DD100x140II
Reclaimer: Vermeer R9x12

Ground: Running sand, dense silt. 

Challenges: With ground conditions of running sand for the last 40 feet on the receiving side, Melcar had to install a steel washer casing to ensure a smooth pullback or the PVC. Preventing hole collapse and inadvertent returns under the river was top priority. 

 

 

Share on Facebook
Share on Twitter
Please reload

Follow Us

I'm busy working on my blog posts. Watch this space!

Please reload

Search By Tags