Potomac Influencer

The Potomac Influencer

Project Details

Client: Potomac Energy (First Energy)

Type: Horizontal Directional Drilling

Duration: 5 Months

Equipment Used: DD100x140II, DD100x120II, DD36x50DR, DD36x50II, reclaiming units for each drill, 3 mud motors, Vermeer DR system.

Product: 3 – 8 inch electrical conduits, bundle, 24in hole

Bores: 4 Bores Total

Lengths: Each bore between 2000' - 3700'

Geotechnical Conditions: Blue Granite, caverns, clay

Challenges: Underground caverns, tight clay before and after rock, freezing temperatures, heavy snowfall and freezing rain.

Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

Certified SBE Infrastructure Construction Contractor

Follow

  • Instagram
  • Melcar LinkedIn
  • YouTube

Contact

+1 (484) 653 8259

Locations

Washington, NJ

Elverson, PA

Houston, TX

Copyright © 2019 Melcar Underground. All rights reserved.