Project Name: Love Creek Crossing

Client: 

Total Length:

Product Diameter:

Drill: DD100x140II
Reclaimer: Vermeer R9x12

Ground: Running sand, dense silt. 

Challenges: With ground conditions of running sand for the last 40 feet on the receiving side, Melcar had to install a st...

March 6, 2018

Melcar's New HK250C - Plowing the Expansion Way

November 20, 2017

With rising concerns for the direction of traditional trades such as construction, we have been closely watching the market trends within our tight niche. In recent years, the contracting sector of the trenchless industry has taken a great financial hit. This is mostly...

October 21, 2017

In recent years, it has become apparent to Melcar executives that a severe lacking in research and development of new technologies from a contractor’s stand point is experienced throughout the construction industry. Research and experimentation is vital to the success...

September 29, 2017

Amid the current influx of pipeline work in the Northeast United States, re-engineering a project connecting New Jersey and New York, USA utilizing the latest technology in the marine cable industry has been underway. The Hudson Transmission Project, originally complet...

February 3, 2017

The mitigation project, funded primarily by FEMA, was a successful effort to eliminate the destructive effects of flooding in the Bronxville Union Free School District. Numerous storms had left the ground floor of the Pondfield Elementary school and the surrounding are...

January 5, 2017

Melcar has successfully completed the installation of two 60in (1,524mm) tunnels through glacial till. The Melcar team faced many complications with this project including: 

~ Geotechnical conditions - sluffying clay, cemented granite (glacial till), boulders larger tha...

November 25, 2016

The Potomac Influencer 

Project Details

Client: Potomac Energy (First Energy)

Type: Horizontal Directional Drilling 

Duration: 5 Months 

Equipment Used: DD100x140II, DD100x120II, DD36x50DR, DD36x50II, reclaiming units for each drill, 3 mud motors, Vermeer DR system....

November 24, 2016

Project Name: Marcellus Shale Fields 

Owner: Gas Field Specialists, Inc.

Duration: 2016

Description: Installation of 1,200ft of gas main transmission lines. 